Johor Bahru, Johor, Malaysia

Berita & Aktiviti

Iskandar Malaysia Eco-Life Challenge 2019

207 schools submitted their electricity bills, 218 schools submitted their water bills and 143 schools submitted the recycling receipts for the school project competition. The total carbon reduction by participating schools in IMELC 2019 is 908,402.67kgCO2. If the pattern was replicated to all 475 schools, in 1 year 12,163,425.80kgCO2 can be reduced. RM174,925.14 electricity bills and RM32,923.82 water bills were saved and RM58,664.55 was collected from recycling. Therefore, a total of RM266,513.51 was saved and earned by the participating schools in IMELC 2019. If the pattern was replicated to all 475 schools, in a year RM30,505,199.51 can be saved and earned. Therefore, on average, a school can save and earn RM75,695.28 in a year through IMELC.